Project Scope
- Re-grading of two dry ponds and two soccer fields for improved drainage using GPS guided equipment.
- Placement of topsoil for ponds and soccer fields over specialized drainage matting.
- Sodded the entire 2.5 hectare area.
Challenges
- Slope stabilization required to prevent erosion and establish rooting of sod.