Beaumont Four Seasons Park

Project Scope Challenges Some Love From The City Of Beaumont “Delta Valley has provided excellent customer service to the City by having superior communication and being very responsive throughout the project as well as completing good quality work. They have also made an effort to contribute back to the community by working with community groups […]

Beaumont West Recreation Site

Project Scope Site stripping and stockpiling over 30,000m3 of topsoil to be screened for landscaping purposes. Rough grading, including onsite common excavation of over 10,000m3 and import almost 30,000m3 of material for onsite placement and compaction. Construction of 7,200m2 gravel parking lot. Installation of drainage culverts on 50 Avenue.  Installation of  approximately 1,200m of French drains for proper drainage. […]

Devon Field of Dreams

Project Scope Site stripping and stockpiling over 10,000m3 of topsoil at strategic onsite locations for landscaping purposes. Removal and dispose over 30,000m3 of unsuitable material from several wetlands. Import over 60,000m3 of clay material for placement and compaction. Onsite gravel parking lot and campground access road construction. Upgrade Miquelon Avenue and Range Road 263A to […]

Edmonton Valley Zoo

Project Scope First phase landscape construction of Polar Extremes quarter. Imported large boulders from Northwest Territories to mimic authentic artic geography. Landscaped interior exhibit and neighbouring storm water pond with Colorado river rock, native plant material, specialized soil, and coniferous mulch. Creation of artificial “Pingo” – earth-covered hills of ice found in the arctic and […]

Ted & Lois Hole Healing Garden

Project Scope Creation of a peaceful haven for hospital staff, patients and their families. Construction of roof top garden oasis composed of raised water features and countless low maintenance perennials. Installation of artistic glasswork screens. Challenges Created a successful buffer from adjacent road noise pollution by strategic combined uses of artistic glasswork screens and trees.

West Pointe of Windermere

Project Scope Landscaping of multiple interconnecting Stormwater Management Facilities (SWMF). Construction of paving stone plaza with custom concrete curbing, nature trails, and many kilometers of manicured boulevards Challenges Successful maintenance of 500+ trees, 2000+ shrubs to obtain FAC after only one year.

Graydon Hill Stormwater Management Facility (SWMF)

Project Scope Regraded northwest corner of SWMF to meet City of Edmonton side slope requirement. Construction of a berm to provide a required buffer between SWMF and environmental reserve. Naturalized landscaping of SWMF. Planting flora native to wetland habitats to endure major storm events. Challenges Successful conservation and placement of live soil and encourage naturalized […]

Parkallen Dry Pond

Project Scope Re-grading of two dry ponds and two soccer fields for improved drainage using GPS guided equipment. Placement of topsoil for ponds and soccer fields over specialized drainage matting. Sodded the entire 2.5 hectare area. Challenges Slope stabilization required to prevent erosion and establish rooting of sod.

Hills of Charlesworth

Project Scope Multi-year, multi-phase landscape construction. Topsoiled and sodded hundreds of meters of boulevards and walkways, complete with almost 500 trees and shrubs for Stage 26 alone. Landscaped Stormwater Management Facility (SWMF), including placing topsoil and laying sod for 3.27ha (8.15ac) area, including planning of almost 400 trees and shrubs. Installed over 900m of fencing […]

Laurel Green

Project Scope Multi-year, multi-phase landscape construction. Unique greenway landscaping and erection of maintenance-free vinyl fencing for 101 sideyards. Landscape construction and maintenance of municipal reserve to ensure proper access for the first wheel-chair accessible playground in South Edmonton. Challenges Successful landscaping of zero-discharge Stormwater Management Facility (SWMF), requiring superior coordination with underground contractors to draw […]