Hills of Charlesworth

Stages 24 and onwards

Edmonton, Alberta, 2018 – Present

Owner

Cantiro (formerly Beaverbrook)

Consultant

Stantec Consulting Ltd.

Project Budget

$1.5 Million

Project Scope

  • Multi-year, multi-phase landscape construction.
  • Topsoiled and sodded hundreds of meters of boulevards and walkways, complete with almost 500 trees and shrubs for Stage 26 alone.
  • Landscaped Stormwater Management Facility (SWMF), including placing topsoil and laying sod for 3.27ha (8.15ac) area, including planning of almost 400 trees and shrubs.
  • Installed over 900m of fencing (combination of regular wood screen, noise attenuation, vinyl, and post & rail).
  • Installation of concrete plazas, swing set and custom furniture in a unique sealed greenway

Challenges

  • Watering – due to the size and access of the SWMF, we set up a custom irrigation system to keep the plants healthy.