Maple Crest

Project Scope Multi-year, multi-phase landscape construction of hundreds of meters of boulevards, bioswales, and multiple municipal reserves. Ongoing maintenance of 75ac wetland, biggest in South Edmonton, until FAC. Landscaping and erosion control of environmentally sensitive Fulton Creek crossing. Challenges Successfully assumed maintenance of existing work and new construction from another contractor undergoing receivership without incurring […]
Century Mile Race Track and Casino

Project Scope Drainage and surface work for the only mile-long horse race track in Western Canada. GPS placement of almost 30,000 tonnes of custom crushed limestone, sand, and specialized blends of mulch for proper grade and drainage. Compaction of subbase and construction of hundreds of meters of gravel roads for access to stables and amenity […]
Re/Max Field

Project Scope Removal 0.50ac area of existing synthetic turf, underlay asphalt, and shale subgrade. Construction of 100m new concrete curb at field edge. Fine grading of 0.96ac area, including installation of geotextile. Installation of over 350m of sub-drainage pipe system. Refinish 0.96ac field area, including repairs and erection of guardrails, installation of Sportsedge flexedge rubber […]
Pogadl Sport Park

Project Scope Subgrade preparation of 3.4 ha (8.4 ac) site to 95% standard proctor and installation of over 1.26km of French drains for proper drainage. Surface preparation including installation of red shale and crushed limestone for 0.90ac area, screening and placement of topsoil and sod for 7.14ac outfields and amenity areas. Construction over 500m of […]